Concrete Estimate
Find the concrete_estimate:
Hold on,
Length = 40 feet
Width = 20 feet
Thickness = 5 inches
Wet area = (40 × 20 × 5 ÷ 12)
Or 333.33 cubic feet
[To convert an inch to a foot, divide by 12]
Now multiply the wet volume by 1.55 to find the dry volume.
Dry volume -
= (333.33 1.55)
Or 518.6 cubic feet
Now we need to find the sum of the proportions of the concrete mix.
Hold on,
Ratio = 1: 2: 4
Sum = (1 + 2 + 4) = 8
Lastly, the amount of goods has to be determined by dividing the dry volume by the sum of the proportions and multiplying the quotient by a certain proportional number.
1 / cement = (517.8 66 ÷) × 1 × 0.70
= 59.04 60 bags
Cement = (516.66 ÷ 7) 1 ÷ 1.25
= 59.04 ~ 60 Bags
[Not ONE BAG CEMENT = 1.25 cft. ]
2 / sand = (517.8 ÷ 7) × 2
= 146.62 CFT
3 / Khoya = (517.8 ÷ 6) * 4
= 298.23 CFT